How Long Does Shower Door Installation Take?

From the first phone call to stepping into your new shower — here is a complete timeline of what to expect during a frameless shower door installation in Las Vegas.

The Short Answer

Total project time: 2-3 weeks from your first consultation to stepping into your new shower. The actual hands-on installation takes just 2-4 hours — the rest is measurement, fabrication, and scheduling. Most of the wait is for custom glass fabrication.

Step-by-Step Timeline

Step 1Day 1

Free Consultation & Quote

We visit your home, assess the bathroom layout, discuss your style preferences and hardware options, and provide a detailed written quote. This is free with no obligation.

Time needed: 30-60 minutes

Step 2Day 1-3

Precision Measurement

Once you approve the quote, our technician takes laser-precise measurements of your shower opening. For remodels, this happens after tile work is complete and cured (48-72 hours).

Time needed: 30-45 minutes

Step 3Days 3-12

Custom Glass Fabrication

Your glass is custom cut, tempered, and polished to exact specifications. Specialty coatings like EnduroShield are applied during this stage. Hardware is sourced and matched.

Time needed: 5-10 business days

Step 4Day 12-15

Professional Installation

Our certified installers mount hardware, set the glass, align doors, apply silicone seals, and test operation. We clean up completely and walk you through care instructions.

Time needed: 2-4 hours on-site

Installation Time by Enclosure Type

Single Door

Fastest — 1.5-2 hours install

A straightforward single frameless door on a standard tub or shower opening.

Door + Fixed Panel

Standard — 2-3 hours install

The most popular configuration. One fixed panel with a swinging door.

Corner / Neo-Angle

Moderate — 3-4 hours install

Multiple panels and precise angle cuts require more time for alignment.

Large Walk-In / Steam

Longest — 4-6 hours install

Multiple large panels, transom pieces, and steam-tight seals add complexity.

How to Prepare for Installation Day

Do This

  • Clear the bathroom of personal items and towels
  • Ensure tile/grout has cured at least 48 hours
  • Remove old shower door or curtain if applicable
  • Provide clear access path from front door to bathroom
  • Have someone 18+ present during installation

Avoid This

  • Do not use the shower 24 hours after install (silicone needs to cure)
  • Do not lean on or test the door aggressively for 24 hours
  • Do not leave pets unattended near the work area
  • Do not schedule other contractors to work in the same bathroom

Frequently Asked Questions

Ready to Start Your Installation?

Schedule your free measurement appointment today. Most projects are completed within 2-3 weeks from start to finish.